waxwings internal blockwork
dining room and kitchen |
Scaffolding will be erected tomorrow at Waxwings, allowing Stuart and Bill (the bricklayers) to work above head height safely.
Until then, internal blockwork continues giving a sense of what the building will look like inside.
The intention is to fill the floor cavity with underfloor heating pipes, insulation and then a final screed.
pantry |
linen store, corridor to bedrooms, store on right |
No comments:
Post a Comment